PreggyAI: Pregnancy Tracker app icon

PreggyAI: Pregnancy TrackerTrack your pregnancy together —
with your partner, and with your baby.

Your baby talks to you, logs what you tell it, and keeps your partner in the loop without you having to text — drawing on published public-health guidance where it helps.

Download on the App Store Get it on Google Play

Not just another pregnancy tracker

Most pregnancy apps show you facts about your baby. PreggyAI lets your baby talk to you — first person, playful, and personal — while it works quietly in the background as your everyday pregnancy companion.

  • Conversational check-ins tuned to your exact week of pregnancy
  • Say how you feel and it logs it for you — no forms to fill in
  • For health questions it may draw on published public-health guidance and show you the source — generated replies can still be wrong, so check it and ask your clinician
  • A partner mode so your baby can talk to your partner too
Chat: she says she has gone off coffee and can't stand the smell, and her baby playfully takes the credit
How it works

Six things most pregnancy apps don't do

Not a list of screens — six moments where the app actually does something for you.

01

Just tell your baby. It does the logging.

Say “I've had really bad nausea all day” and your baby answers the way a baby would — then writes it into your symptom log for you. Mention a low mood, or a scan you've got coming up, and the same thing happens.

No forms. No hunting for the right tracker screen. If it's missing something — how bad it was, what date, what time — it asks you right there in the chat.

Works on every plan. You fill in anything it asks for before it saves.

Chat: she tells her baby she has had bad nausea all day, the baby asks how bad, and a “Symptom logged!” confirmation appears
She says it
Her Symptoms list with the nausea entry, rated severe
It's already logged
02

Your partner finds out without you having to text.

Log a symptom that's more than a niggle and your baby may tell your partner — on their lock screen, in its own voice, while you put your feet up. A low mood, a kick session, a new appointment, a note: same thing.

It's the part of pregnancy nobody warns you about — the constant updating of another person. Your baby does it instead.

You both agree to what's shared when you link. Symptom and mood updates are limited in how often they can arrive, whoever receives them can mute those notifications in Settings, and either of you can end all sharing at any time by unlinking. The full list is shown in the app before you link, and in our Privacy Policy.

She logs it
He just knows
03

Ask your baby to pass it on.

“Tell Daddy I'm craving pineapple.” And it does — in its own words, straight into his chat with the baby. Sweeter than a text, and it arrives from someone he already wants to hear from.

On PRO, your baby can offer to carry something over too. It only ever goes if you say yes.

You're always shown the message that was sent.

Chat: she asks her baby to tell Daddy she is craving pineapple, and the baby shows the note it sent
She asks
His lock screen: a notification from the baby asking him to bring Mama some pineapple
He gets it from the baby
04

He follows every contraction, live.

The moment she starts timing, her baby tells him it's happening. Then every contraction she times appears on his screen too, as it happens — whether he's in the next room or still driving home.

Nobody has to narrate anything down a phone line. He can already see it.

The timer itself is free and yours alone. Sharing it live with a linked partner is the PRO part.

Her timer
His screen, same moment
05

It remembers to check back on you.

Add an appointment — or just mention one in the chat — and it's saved, with a reminder. Afterwards, your baby asks how it went.

It does the same after a rough symptom or a low day: a few hours later, a check-in that names the actual thing. Not “how are you feeling?” — “how's that nausea now?”

Works on every plan, and you can turn any category of notification off in Settings.

Chat: she mentions her ultrasound on Friday at ten, and the baby offers a quick-save button for the appointment
She mentions it once
Chat: the baby checks in on its own, asking whether her back is feeling any kinder now, and she replies that she is fine
It comes back to her
06

A baby with a personality — and a memory.

Pick who your baby is: warm and cuddly, playful and giggly, a curious explorer, calm and soothing, or bright and bubbly. Then it starts remembering you — your sister's visit, the job that's stressing you out, the smell you can't stand this month.

Weeks later it brings those things up by itself, because it knows them. On PRO it goes further: it grows a character of its own, and holds on to far more of what you've been talking about.

Choosing a personality is free, and so is your baby remembering the things you tell it. You can change the personality any time in Settings.

The personality picker with Playful & Giggly selected
You choose who it is
Chat: asked what is on its mind, the baby brings up Friday's ultrasound and her mango-and-pineapple cravings
It remembers on its own
Features

Everything pregnancy, in one app

From your baby's first flutter to the hospital bag checklist — one pregnancy tracker for the whole nine months.

📈

Weekly growth updates

See exactly how your baby is developing, week by week, with milestones and growth imagery tied to your actual due date.

Week 39 growth screen: an illustration of the baby, with a note that it is about the size of a small watermelon
⏱️

Contraction timer

Start timing with one tap and watch the pattern build — length, gap, and how it's changing — so you have something real to tell your midwife.

PRO lets your partner follow it live

The contraction timer mid-contraction, with past sessions listed below
🌈

Mood tracker

Some days are hard, and that's data too. Log how you're feeling and see it next to everything else that's going on — with a check-in from your baby when it's rough.

The mood check-in with eight moods to tap, and a mood diary of recent days
🦶

Kick counter

A simple, reassuring way to track your baby's movements and notice patterns — with guidance on when it's worth mentioning to your provider.

The kick tracker with a Start Counting button and past counting sessions
📓

Symptom journal

Log how you're feeling in seconds and spot patterns over time, so you walk into every appointment with real answers, not guesswork.

The symptom journal listing nausea and back pain, each with a severity rating
⚖️

Weight tracker

Log your weigh-ins and see the trend over time, without the judgment — a clear record to talk through with your provider.

The weight tracker: current weight, total change, a progress chart and weigh-in history
🗓️

Appointments & reminders

Keep every prenatal appointment in one place, with a reminder before each scan, test, or check-up.

Doctor appointments: an upcoming ultrasound in six days, and past OB/GYN visits
📸

Bump photo timeline

Capture your bump week by week and watch your whole pregnancy come together as a beautiful, private timeline.

PRO lifts the weekly limit, backs them up, and lets your partner see them

The Bump Journey timeline with dated weekly photos
📝

Smart notebook

Ready-made templates for your birth plan, hospital bag, and trimester checklists — or start a blank note and make it your own.

PRO backs it up and shares it with your partner

My Notebook: a birth plan and hospital bag checklist, plus a baby-names note shared from Daddy
🔒

Private by design

Lock the app with Face ID or fingerprint. Server data is encrypted in transit and at rest, selected sensitive text has added field-level encryption, and you can delete your account and remove its content from active systems at any time. The local device copy is protected by app-private storage and your device security, not separate PreggyAI encryption.

The app lock screen asking for Face ID or a six-digit PIN

Also in the app

Apple Health & Health Connect — daily steps and workouts, if you connect them
Cloud backup for your photos and notes
Suggested things to say, when you don't know how to start
Metric or imperial — kg/lb, cm/in, your call
Reminders that follow your own time zone
Per-category notification controls, and one switch to pause them all
Report any AI response you're unhappy with, from the message itself
Promo codes
Delete your account and its content whenever you want
Plans

Free is a real app, not a demo

Everything about safety is identical on both plans. What PRO buys is memory, depth, and your partner.

WhatFreePRO
Where the plans differ
Chatting with your baby A limited number of messages, with daily and monthly limits Unlimited, for you and your partner*
Remembering your conversations Only remembers the last few messages Remembers far more of the conversation, and what you've been talking about over recent days
Its own personality No rich personality Grows into it — a rich character of its own, and its own memories of being your baby
Partner mode 14 days free when you link someone The whole pregnancy
Messages passed to your partner Not included Any time you ask*
Contraction timer Yours, on your own phone Your partner follows every one, live
Bump photos One a week As many as you like, at full quality*
Photos & notes Kept on your phone Backed up to the cloud, and your partner can see them
The same on both
Remembering what you tell it Keeps the things you tell it about you — your sister's visit, the job stress, what you've gone off this month Same
Trackers All of them — symptoms, moods, kicks, weight, appointments, contractions Same
Telling your baby instead of filling in a form Yes Yes
Check-ins from your baby Yes Yes
Week-by-week growth Yes Yes
Safety The same AI, the same safety rules, the same urgent-symptom handling Identical — never a paid feature

*Fair-use limits apply to prevent abuse — plenty of room for real, everyday conversations, notes and photos.

PRO is a monthly subscription, or a one-time Pregnancy Pass that covers 40 weeks and doesn't renew. Prices are shown in the app.

Trust & safety

Honest about what an AI can and can't do

📚

Guidance from public-health bodies

Where relevant guidance is available, your baby may draw on published material from bodies such as the NHS, CDC, FDA and NICHD, and show you where it came from. Generated answers and source links can still be wrong or mismatched — check the source, and ask your clinician.

🚨

The same safety on every plan

Free and PRO accounts talk to the same AI with the same safety rules. Urgent symptoms are flagged the same way on both, with guidance to contact your provider or emergency services — and that does not depend on a subscription or a remaining message.

🔐

Built to protect your data

Biometric app lock; encryption in transit and at rest on our servers; added field-level encryption for chat and selected sensitive text; account-deletion controls; and no ads or sale of your data.

Read our AI Safety Protocol — how the AI works, the safeguards and their limits, and what happens if you tell it something frightening — and our Consumer Health Data Privacy Policy, which covers the pregnancy and health information you put into the app.

PreggyAI is not a substitute for professional medical advice, diagnosis, or treatment. Always talk to your doctor, midwife, or other qualified provider with any questions about your pregnancy. PreggyAI is not affiliated with, or endorsed by, the NHS, CDC, FDA, NICHD, or any other health body.

Your baby is waiting to say hello.

Download PreggyAI and start the conversation.

Download on the App Store Get it on Google Play